If the roof runs at an angle to the brick wall then you must step the flashing as described in the photo.
Small roof to brick wall aluminum flashing.
Most flashing is 8 inches wide.
Starting at the lowest part of the roof completely cover all three exposed surfaces of the block with peel and stick membrane.
Should i bolt a ledger board into the brick to support the roof.
The roof will be a shed type roof with 4 12 pitch extending out from the brick veneer wall.
The flashing extends onto the roof a minimum of 2 inches 4 inches is preferable in more severe climate areas.
Make sure that you begin at the bottom of the angle and work up.
Continue reading below our video of the day step 1 choose what kind of metal flashing you need.
Hot and cold weather will make the caulk fail when the metal buckles between nails.
Velux c01 c04 c06 shingle roof aluminum deck mount skylight flashing kit.
Model edl c06 0000b.
For pricing and availability.
Velux d06 d26 shingle roof aluminum deck mount skylight flashing kit.
The house is two story brick veneer.
Flash angled roofs in the step method which requires shorter flashing lengths of 6 inches.
This leaves enough room for the vertical leg of the step flashing.
It is simply a piece of metal liad to the wall and held in place with masonry nails and caulked.
You can hire a professional to install it against a brick wall or you can do it yourself.
Metal roof flashing is a galvanized sheet metal bent at right angles with about eight to 12 inches on each side of the angle.
The metal flashing is formed with a hook edge and cleated on 12 centers.
I show how i construct it showning in detail how to do the lead flashing.
Metal flashing prevents rain and run off water from seeping into the space between the roof and the wall and causing damage to the framing.
Use the metal break tool to bend the flashing lengthwise in the middle according to the angle of the roof joint.
Model edl d06 0000b.
Proper flashing is crucial at a roof to wall intersection.
The second is good the flashing is turned into a deep cut mortar joint about 1 and nails are placed so the head of the nail laps over the bend edge about 3 4.
Flashing joints are lapped 6 in the direction of water flow.
Step 6 make a 10 degree bend on the shingle edge of the flashing approximately 1 2 inch from the edge.
4 inches should go up the house wall and 4 inches should go on top of the porch roof shingles.
The flashing extends up the wall at least 4.
The porch will be supported on concrete piers with posts.
A 2x4 laid on the roof is a good way to gauge this.